The PECO Service and Meter Application form serves as a crucial document for individuals and businesses seeking electric service from PECO Energy. This form outlines the necessary steps and information required to initiate service, ensuring that applicants provide complete and accurate details. At the outset, applicants must identify the appropriate PECO regional office based on their service location. Essential personal information, such as the customer’s name, service address, and either a driver's license number or Social Security number, is required. Additionally, the form requires applicants to specify their billing address and provide details about the electrician or contractor involved in the service request. This includes the contractor's tax identification number and preferred communication methods. The application also prompts users to describe the type of service needed—whether it’s for new construction, upgrades, or temporary service—and to provide specifics about the load characteristics, including connected kilowatts and maximum demands. Furthermore, applicants must complete tables regarding motor information and any additional comments that may assist in processing the request. A signature and date are mandatory to validate the application. Overall, this comprehensive form is designed to streamline the process of obtaining electric service while ensuring compliance with PECO's service requirements.

Preview - Peco Service And Meter Application Form

INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER

Please refer to the sample application while reviewing the following notes. The letters below correspond with those on the sample. NOTE: THE "BLANK" FORM IS BELOW THE "SAMPLE" FORM

A.After reading the instructions at the top of the application, locate the PECO regional office in which the service is requested. Check the appropriate box and mail or fax the completed application to the appropriate regional office.

B.Complete the fields for customer's name and service location. Customer's Driver's License Number or Social Security Number is now required.

Note: (*) Include PECO Energy pole # and/or Lot # only if applicable.

(**) Use the address of the service when applying for underwriter's inspection.

C.Complete the fields for customer's PECO billing address or account number (within last 60 days).

D.Complete fields regarding you as the electrician or contractor, and indicate where you would like the reply sent. The Electrician/Builder Tax Identification number is now required. Also, please include the date you would like the reply returned to you.

E.Indicate your current construction status, and include the date PECO service is requested. Please avoid using "as soon as possible".

F. thru J. Indicate the following:

Type of Request

Type of Service (include number of units and area per unit)

Service Characteristics

Meter Information

Heating/Air Conditioning

K.Complete the table concerning the load characteristics of the service. For each applicable type of load, provide: 1) Connected KW, 2) Maximum Summer KW Demand, and 3) Maximum Winter KW Demand.

L.Complete the table concerning motor information.

M.If compensated metering will be used, indicate totalizer and general load (KW).

N.Include any additional comments.

O.

Application MUST be signed and dated.

Forms Rev. 5/18

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

INSTRUCTIONS:

Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.

All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.

A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.

NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR DEMOLITION REQUEST

NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com

PHILADELPHIA

 

 

 

DELAWARE & CHESTER COUNTIES

BUCKS & MONTGOMERY

 

 

 

 

 

 

 

NEW RESIDENTIAL

 

 

 

 

 

 

COUNTY

 

 

 

1050 W. Swedesford Rd.

COUNTIES

 

 

 

 

 

 

 

 

 

CONSTRUCTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

830 S. Schuylkill Ave.

Berwyn, PA 19312

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

 

 

 

(All Counties)

 

 

 

 

 

 

 

 

 

 

Philadelphia, PA 19146

Email:DelChesterServiceApplications@ex

Warminster, PA 18974

 

 

 

 

 

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Email:PhilaNewBusiness@e

eloncorp.com

 

 

 

 

 

 

 

Email:Bucksmontserviceapplications@e

Warminster, PA

18974

 

 

 

 

 

 

 

 

 

xeloncorp.com

 

 

 

Fax # (610) 725-1416

 

 

 

 

xeloncorp.com

 

 

 

 

 

 

 

 

 

Email:NRCGMETERORDERS@P

Fax # (215) 731-2327

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3240

 

 

 

 

 

 

 

 

 

eco-Energy.com

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3380

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER NAME

 

 

 

 

 

 

 

 

 

 

 

 

Tax ID # or SSN

 

 

TYPE OF REQUEST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Service

 

 

Load Increase/Decrease

 

Reintroduction of Service

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Temporary Service

Upgrade/Changes

 

Demolition (Remove

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Separation of Wiring

Service Relocation

 

 

 

Service)

 

 

 

 

 

 

** ADDRESS TO BE SERVED

 

 

B

 

 

 

 

 

APARTMENT/LOT #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

 

Make-Safe (De-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

energize/Cover)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CITY, STATE

 

 

 

 

 

 

 

 

 

 

 

 

ZIP CODE

 

 

 

 

 

 

TYPE OF SERVICE: Please include site plan.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RESIDENTIAL

 

 

 

 

 

 

 

 

 

 

 

 

COMMERICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single House

Mobile Home

Store

 

 

 

 

Office

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Apartment

Modular Home

Industrial

 

 

 

 

Warehouse

 

 

 

UTILITY POLE#

SUBDIVISION/DEVELOPMENT

 

 

TOWNSHIP/MUNICIPALITY/WARD#

 

Duplex

Town House

Restaurant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other _____________________________

Other _____________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Area of Building _______________________ Sq. Ft.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* If Applicable

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE CHARACTERISTICS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

** Please use this address when applying for underwriter’s inspection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

 

 

WIRES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Underground

 

 

Aerial

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMERS BILLING ADDRESS

 

C

 

 

-OR-

 

 

PECO ENERGY ACCOUNT#

 

 

 

 

 

 

 

 

 

 

3

 

 

240

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS _________

 

 

 

 

 

3

 

 

120/240

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

 

 

3

 

 

120/208

 

 

 

4

 

 

 

 

CITY, STATE

 

 

ZIP CODE

 

 

 

 

 

TELE. #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120

 

 

2

 

 

 

 

 

 

 

 

3

 

 

277/480

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120/240

 

3

 

 

 

 

 

 

 

 

3

 

 

13200

 

 

 

3 or 4

SEND REPLY TO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

120/240

 

5

 

 

 

 

 

 

 

 

3

 

 

33000

 

 

 

3 or 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELECTRICIAN’S OR BUILDER’S NAME

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

METER INFO:

Two Meters, Commercial (General/Totalizer)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single Meter Required

 

 

 

 

 

 

 

Multiple Meter Total No. _____________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ADDRESS

 

 

 

 

 

 

 

 

 

 

Reply Requested by:

 

 

HEATING/AIR CONDITIONING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

/

/

 

 

 

Central Air _____ Tons

 

Resistance

 

 

 

J

 

Heat Pump _____ Tons

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Natural Gas

 

 

 

Propane

 

 

 

 

Type Back-Up _________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other ________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

City, State

 

 

 

 

 

 

 

 

 

 

ZIP CODE

 

 

 

 

 

 

CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTED

 

PECO ENERGY USE ONLY (DEMAND)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TYPE

 

LOAD (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELE. #

 

 

 

 

 

 

 

 

 

 

E-MAIL ADDRESS

 

 

 

 

 

SUMMER (kW)

 

 

 

Winter (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIGHTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

K

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CURRENT CONSUTRCTION STATUS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEATING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Not Started – Date Customer Will Start Work: _____/_____/_____

In Progress Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AIR/COND.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approximate Date Service Requested: _____/_____/_____

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

TANKLESS WATER HTR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MISC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER COMMENTS/ DESCRIPTIN OF WORK

 

 

N

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Include single line diagram and substation arrangement if appropriate.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LARGEST MOTOR SPECIFICATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O

 

 

 

 

 

 

 

 

 

 

QUANTITY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTALIZER LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SIZE (HP)

 

 

 

 

 

 

 

 

 

 

L

 

 

 

 

 

 

 

 

M

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCKED ROTOR CURRENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOTOR CODE LETTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUBMITTED BY: _________________________________ DATE: ______________________

 

PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERAL LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VOLTAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

Enclosures: Site Plans Single Line Diagram Substation Arrangement

FREQ. OF STARTING (PER HR.)

PURPOSE

KW

INFORMATION BELOW WILL BE FILLED IN BY PECO:

 

 

 

 

 

 

 

 

 

 

 

Service Request No.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BUS/MAJ ACCT REP

 

TELEPHONE

DATA RECEIVED

DESIGNER

 

 

 

 

 

DATA RECEIVED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELEPHONE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POL SUB

 

RATE

 

RIDER

 

CONTRACT LIMITS

 

SIC NUMBER

 

T

 

DATE REPLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NUMBER

 

COMPLETED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS

 

WIRES

 

VOLTAGE

PHASE

 

 

CIRCUIT

 

 

 

 

 

C-QUAD

 

T-QUAD

LOAD (KVA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUMMER_____WINTER ____

SERVICE CHARACTERISITICS – Select One from Each

 

 

 

 

 

 

 

 

 

POLE # / MH # LOCATION

 

CUT THROUGH DATE

SERVICE TYPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Aerial

 

 

 

Underground

URD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RATE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Residential

 

 

Comm (Non-

 

Comm (Demand)

 

HT/PD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Demand)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERATION PROCUREMENT CLASS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Class 1 (Residential)

 

 

 

Class 2 (Commercial, less than 100kW)

 

 

 

 

 

 

 

 

 

 

 

 

Class 3 (Commercial, 100kW to 500kW)

 

Class 4 (Commercial, greater than 500kW)

 

 

 

 

 

 

 

 

 

 

NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load

 

 

 

 

 

 

estimates for the first year of service. The customer’s Procurement Class will be adjusted each year,

 

 

 

 

 

 

based on actual usage.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

METER TYPE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KWH

 

 

IND. DEMAND

RECORDER

TOU

 

 

 

 

 

 

 

 

 

 

SERVICE PHASING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SINGLE PHASE

TWO PHASE

THREE PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE REQUIREMENTS:

 

 

 

 

 

 

METERING LOCATION AND REQUIREMENTS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Present Location:

Meter # _______________

CTs-

PTs-________

Present Service OK

Loop Only

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________

 

 

Taps Only

 

 

See Job # ________________________________

 

Indoo

Outdoor

 

On ________ Wall, ________ Ft. From ________ Wall, ________ ft. Above

 

 

 

 

 

 

 

 

 

 

r

 

 

 

 

 

Ground

 

 

 

ADVANCE NOTIFICATIONS:

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER BILLING:

 

 

 

Underwriter’s Cert.

 

Yes

No

 

 

 

 

 

 

 

 

 

Advance Billing

Yes

 

$_______________

Required

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Required

 

 

 

__

Customer to Trench

 

Yes

No

 

 

 

 

 

 

 

 

 

 

 

 

No Customer

 

 

Permit Required

 

Yes

No

State

Other

 

 

 

 

 

 

 

Charges:

$_______________

 

 

 

 

 

 

 

 

 

 

 

__

 

 

 

 

 

 

 

 

_______________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cust. #

 

 

Date

 

 

ACT 222 Cert. Required

 

Yes #

 

 

No

N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_________________________

 

___________________________

 

 

 

_____________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BTCO #

 

 

Date

 

 

PA One Call #

 

 

 

 

 

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________________________

 

___________________________

___________________________

 

 

 

 

__________________________

 

 

 

 

 

 

 

CATV #

 

 

Date

 

 

Gas

BTCO

CATV

Other

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________________________

 

___________________________

 

 

 

 

 

___________________

__________________________

 

 

 

 

 

 

 

 

Other

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

__________________________

 

___________________________

SKETCH / INSTRUCTIONS

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

INSTRUCTIONS:

Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.

All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.

A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.

NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR DEMOLITION REQUEST

NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com

PHILADELPHIA COUNTY

DELAWARE & CHESTER COUNTIES

BUCKS & MONTGOMERY

 

 

 

 

 

NEW RESIDENTIAL

 

 

 

830 S. Schuylkill Ave.

1050 W. Swedesford Rd.

 

COUNTIES

 

 

 

 

 

 

 

 

CONSTRUCTION

 

 

 

Philadelphia, PA 19146

Berwyn, PA 19312

 

400 Park Ave.

 

 

 

 

 

 

 

 

(All Counties)

 

 

 

 

 

 

Email:PhilaNewBusiness@ex

Email:DelChesterServiceApplications@exe

Warminster, PA 18974

 

 

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

eloncorp.com

 

 

loncorp.com

 

 

 

Email:Bucksmontserviceapplications@e

 

Warminster, PA 18974

 

 

 

Fax # (215) 731-2327

Fax # (610) 725-1416

 

xeloncorp.com

 

 

 

 

 

 

 

 

Email:NRCGMETERORDERS@P

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3240

 

 

 

 

 

 

eco-Energy.com

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3380

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER NAME

 

 

 

 

Tax ID # or SSN

 

 

 

TYPE OF REQUEST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Service

 

 

Load Increase/Decrease

 

Reintroduction of Service

 

 

 

 

 

 

 

 

 

 

 

 

Temporary Service

Upgrade/Changes

 

Demolition (Remove

** ADDRESS TO BE SERVED

 

 

APARTMENT/LOT #

 

 

 

Separation of Wiring

Service Relocation

 

 

Service)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Make-Safe (De-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

energize/Cover)

 

 

 

CITY, STATE

 

 

 

 

ZIP CODE

 

 

 

TYPE OF SERVICE: Please include site plan.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RESIDENTIAL

 

 

 

 

 

 

 

 

 

COMMERICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single House

Mobile Home

Store

 

 

 

 

Office

 

 

 

UTILITY POLE#

SUBDIVISION/DEVELOPMENT

 

TOWNSHIP/MUNICIPALITY/WARD#

 

Apartment

Modular Home

Industrial

 

 

 

 

Warehouse

 

 

 

 

 

 

 

 

 

 

 

 

Duplex

Town House

Restaurant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other _____________________________

Other _____________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Area of Building _______________________ Sq. Ft.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*

If Applicable

 

 

 

 

 

 

 

 

 

SERVICE CHARACTERISTICS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

**

Please use this address when applying for underwriter’s inspection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

 

 

 

 

 

 

 

 

Underground

 

 

Aerial

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMERS BILLING ADDRESS

 

 

PECO ENERGY ACCOUNT#

 

 

 

 

 

 

 

 

 

 

3

 

 

240

 

3

 

 

 

 

 

 

 

-OR-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS _________

 

 

 

 

3

 

 

120/240

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

3

 

 

120/208

 

4

 

 

CITY, STATE

 

ZIP CODE

 

TELE. #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120

 

 

2

 

 

 

 

 

3

 

 

277/480

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120/240

 

3

 

 

 

 

 

3

 

 

13200

 

3 or 4

 

SEND REPLY TO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

120/240

 

5

 

 

 

 

 

3

 

 

33000

 

3 or 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELECTRICIAN’S OR BUILDER’S NAME

 

 

 

 

 

 

 

METER INFO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Two Meters, Commercial (General/Totalizer)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single Meter Required

 

 

 

 

 

Multiple Meter Total No. _____________

ADDRESS

 

 

 

 

Reply Requested by:

 

 

 

HEATING/AIR CONDITIONING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/

/

 

 

Central Air _____ Tons

 

Resistance

 

 

 

 

 

Heat Pump _____ Tons

 

 

 

 

 

 

 

 

 

Natural Gas

 

 

 

Propane

 

 

 

 

 

Type Back-Up _________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other ________________

CITY, STATE

 

 

 

 

ZIP CODE

 

 

 

CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTED

 

PECO ENERGY USE ONLY (DEMAND)

TELE. #

 

 

 

 

E-MAIL ADDRESS #

 

 

 

 

 

TYPE

 

LOAD (kW)

 

SUMMER (kW)

 

Winter (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIGHTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CURRENT CONSUTRCTION STATUS:

 

 

 

 

 

 

 

HEATING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Not Started – Date Customer Will Start Work: _____/_____/_____  In Progress Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AIR/COND.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approximate Date Service Requested: _____/_____/_____

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TANKLESS WATER HTR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MISC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER COMMENTS/ DESCIPTION OF WORK:

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Include single line diagram and substation arrangement if appropriate.

 

 

 

 

 

 

 

 

 

 

 

 

LARGEST MOTOR SPECIFICATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

QUANTITY

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTALIZER LOAD

 

 

 

 

 

 

 

 

 

 

 

 

SIZE (HP)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCKED ROTOR CURRENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOTOR CODE LETTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUBMITTED BY: _________________________________ DATE: ______________________

 

 

PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERAL LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VOLTAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

Enclosures: Site Plans Single Line Diagram Substation Arrangement

FREQ. OF STARTING (PER HR.)

PURPOSE

KW

INFORMATION BELOW WILL BE FILLED IN BY PECO:

 

 

 

 

 

 

 

 

 

 

 

Service Request No.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BUS/MAJ ACCT REP

 

TELEPHONE

 

DATA RECEIVED

DESIGNER

 

 

 

 

 

 

DATA RECEIVED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELEPHONE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POL SUB

 

RATE

 

RIDER

 

CONTRACT LIMITS

 

SIC NUMBER

 

 

T NUMBER

 

DATE REPLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMPLETED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS

 

WIRES

 

VOLTAGE

PHASE

 

CIRCUIT

 

 

 

 

 

C-QUAD

 

T-QUAD

LOAD (KVA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUMMER_____WINTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

____

SERVICE CHARACTERISITICS – Select One from Each

 

 

 

 

 

 

 

 

 

POLE # / MH # LOCATION

 

 

CUT THROUGH DATE

SERVICE TYPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Aerial

 

 

 

Underground

 

URD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RATE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Residential

 

 

Comm (Non-Demand)

Comm (Demand)

 

HT/PD

 

 

 

 

 

 

 

 

 

 

 

 

GENERATION PROCUREMENT CLASS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Class 1 (Residential)

 

 

 

Class 2 (Commercial, less than 100kW)

 

 

 

 

 

 

 

 

 

 

 

 

Class 3 (Commercial, 100kW to 500kW)

 

Class 4 (Commercial, greater than 500kW)

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load estimates for

 

 

 

 

 

 

 

 

 

 

the first year of service. The customer’s Procurement Class will be adjusted each year, based on actual usage.

 

 

 

 

 

 

 

 

 

 

METER TYPE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KWH

 

 

IND. DEMAND

 

RECORDER

TOU

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE PHASING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SINGLE PHASE

TWO PHASE

 

THREE PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE REQUIREMENTS:

 

 

 

 

 

 

METERING LOCATION AND REQUIREMENTS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Present Location:

Meter # _______________

 

CTs- ________

PTs-________

Present Service OK

Loop Only

 

 

 

 

 

Indoor Outdoor

On ________

Wall, ________ Ft. From ________ Wall, ________ ft. Above Ground

Taps Only

 

 

See Job # _________________________________

 

ADVANCE NOTIFICATIONS:

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER BILLING:

 

 

 

 

 

 

 

Underwriter’s Cert. Required

 

Yes

No

 

 

 

 

 

 

 

Advance Billing Required Yes

 

 

$_________________

Customer to Trench

 

Yes

No

 

 

 

 

 

 

 

 

 

 

 

 

No Customer Charges: $_________________

Permit Required

 

 

 

Yes

No

State

Other _______________________

Cust. # _________________________

Date ___________________________

ACT 222 Cert. Required

 

Yes # _____________

No

N/A

 

 

 

 

BTCO # ________________________

Date ___________________________

PA One Call # ___________________________

 

 

Date __________________________

CATV # ________________________

Date ___________________________

Gas

BTCO

CATV

Other ___________________

Date __________________________

Other __________________________

Date ___________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SKETCH / INSTRUCTIONS

Document Specifics

Fact Name Fact Details
Form Purpose The Peco Service and Meter Application form is used to request electric service and meter installation.
Required Information Applicants must provide their name, service location, and either a Driver's License Number or Social Security Number.
Application Submission Completed applications should be mailed or faxed to the appropriate PECO regional office based on the service location.
Construction Status Applicants must indicate their current construction status and the date service is requested, avoiding vague terms like "as soon as possible."
Load Characteristics A table regarding load characteristics must be completed, detailing connected KW, maximum summer KW demand, and maximum winter KW demand.
Motor Information Applicants are required to provide motor specifications, including size and locked rotor current.
Compliance Requirement All work must comply with the PECO Electric Service Requirements manual and be inspected by an approved agency.
Governing Laws Applications are subject to Pennsylvania Public Utility Commission regulations and local ordinances.

Peco Service And Meter Application: Usage Instruction

Completing the PECO Service and Meter Application form is an essential step in securing electric service for your property. It requires careful attention to detail to ensure that all necessary information is provided. Following the steps outlined below will help facilitate a smooth application process.

  1. Begin by reading the instructions at the top of the application form.
  2. Identify the appropriate PECO regional office for your service request. Check the corresponding box and prepare to mail or fax the completed application to that office.
  3. Fill in the customer's name and the service location. You must also provide either the customer’s Driver's License Number or Social Security Number. If applicable, include the PECO Energy pole number and/or Lot number.
  4. Complete the billing address fields or include your PECO account number if you have one from the last 60 days.
  5. Provide details regarding the electrician or contractor involved. Include their Tax Identification number and specify where you would like the reply sent. Also, indicate the desired date for a response.
  6. Indicate your current construction status and provide the date you are requesting PECO service. Avoid vague terms like "as soon as possible."
  7. Specify the type of request you are making (e.g., new service, load increase, temporary service). You will also need to describe the type of service, including the number of units and area per unit.
  8. Fill out the service characteristics section, detailing the meter information and any heating or air conditioning systems in use.
  9. Complete the load characteristics table, providing information for each applicable load type, including connected KW and maximum demand for summer and winter.
  10. If applicable, provide motor information, including specifications for any motors being used.
  11. Indicate if compensated metering will be utilized, including totalizer and general load in KW.
  12. Include any additional comments or descriptions relevant to your application.
  13. Finally, ensure that the application is signed and dated before submission.

Once the form is completed and submitted, PECO will review your application. They may contact you for any clarifications or additional information if needed. It is important to monitor your communications closely to avoid any delays in processing your request.

Learn More on Peco Service And Meter Application

What is the purpose of the PECO Service and Meter Application form?

The PECO Service and Meter Application form is used to request electric service from PECO. This includes new service requests, load increases or decreases, temporary services, and service relocations. Completing this form accurately is essential for ensuring that your service request is processed without delays.

What information do I need to provide on the application?

You will need to provide several key pieces of information, including:

  • Your name and service location.
  • Your Driver's License Number or Social Security Number.
  • Your PECO billing address or account number.
  • Details about the electrician or contractor involved.
  • Type of service requested and service characteristics.
  • Load characteristics, including connected KW and maximum demand.

Make sure to complete all sections of the form to avoid processing delays.

How do I submit the application?

You can submit the completed application by mailing or faxing it to the appropriate PECO regional office. Make sure to check the box for the correct office based on where the service is requested. You can find the contact details for the regional offices on the PECO website.

What happens if I don't provide all the required information?

If you fail to provide all the necessary information, it may result in delays in processing your application. Incomplete applications can lead to additional requests for information, which can extend the time it takes to get your service started. It’s crucial to double-check your application before submission.

What should I do if I need to demolish a building?

If you are demolishing a building and need PECO to remove electric or gas facilities, you must call 8-1-1 (PA One Call) to make a demolition request. This step is important to ensure safety and compliance with local regulations. Do not proceed with demolition until you have confirmed the necessary arrangements with PECO.

Common mistakes

Filling out the PECO Service and Meter Application form can be straightforward, but several common mistakes can lead to delays or complications. One frequent error is failing to include the customer's Driver's License Number or Social Security Number. This information is now a requirement, and omitting it can cause the application to be rejected or delayed.

Another common mistake involves the service address. Applicants often forget to provide the correct service address or include unnecessary details like the PECO Energy pole number or lot number when not applicable. Accurate information is crucial for processing the application efficiently.

Many applicants also overlook the requirement to specify the current construction status and the exact date when PECO service is requested. Using vague terms like "as soon as possible" can lead to confusion and further delays. Providing a clear timeline is essential for the scheduling of services.

Completing the load characteristics table is another area where mistakes frequently occur. Applicants may either leave fields blank or provide incorrect data for connected kilowatts, summer demand, or winter demand. This table is critical for PECO to assess the service needs accurately, and incomplete information can hinder the application process.

Additionally, some individuals neglect to sign and date the application. The signature is a mandatory component of the application. Without it, the form cannot be processed, leading to unnecessary delays.

Lastly, applicants often fail to review the entire form before submission. Missing additional comments or failing to include necessary enclosures like site plans can result in the application being incomplete. Thoroughly checking the form against the instructions can help prevent these issues.

Documents used along the form

The PECO Service and Meter Application form is a crucial document for individuals and businesses seeking electric service from PECO. However, it is often accompanied by other forms and documents that provide additional information or fulfill specific requirements. Understanding these documents can streamline the application process and ensure compliance with PECO's policies.

  • Credit Application and Agreement: This form is necessary for new customers who have not had service with PECO in the past 60 days. It establishes the customer’s creditworthiness and outlines the terms of service.
  • Site Plans: These drawings illustrate the layout of the property, including the proposed location of electrical service connections. They help PECO assess service requirements and feasibility.
  • Single Line Diagram: This technical drawing depicts the electrical system's layout, showing how components are connected. It is essential for understanding load distribution and service requirements.
  • Substation Arrangement: This document outlines the configuration of the electrical substation that will serve the property. It is important for large commercial or industrial applications.
  • Underwriter’s Certificate: This certification verifies that the electrical work complies with local codes and standards. It is often required before service can be activated.
  • PA One Call Notification: This form confirms that the applicant has notified the PA One Call system to mark underground utilities before any digging or construction begins.
  • Demolition Request Form: If the application involves demolishing a building, this form must be submitted to request the removal of existing electric or gas facilities.
  • Inspection Reports: These documents confirm that the electrical installation has been inspected and approved by a qualified agency, ensuring safety and compliance with regulations.
  • Permits: Depending on the nature of the work, local or state permits may be required. These documents authorize the applicant to proceed with construction or electrical work.
  • Customer Comments or Descriptions of Work: This section allows applicants to provide additional information or specific requests related to their service needs, helping PECO tailor their response.

By preparing these additional forms and documents alongside the PECO Service and Meter Application, applicants can enhance the efficiency of their service request. This proactive approach minimizes delays and facilitates a smoother transition to receiving electric service.

Similar forms

The Peco Service and Meter Application form bears similarities to a Residential Lease Agreement. Both documents require detailed personal information, including names and addresses, to establish a formal relationship. Just as a lease outlines the terms of tenancy, the Peco application specifies the conditions under which electric service will be provided. Each document necessitates signatures to confirm agreement and understanding of the terms laid out, ensuring that both parties are legally bound by their commitments.

Another comparable document is the Utility Service Application. This form, like the Peco application, is used to request utility services, whether for electricity, water, or gas. Both applications require information about the service location, customer identification, and service requirements. They also emphasize the importance of accuracy and completeness, as any missing information can lead to delays in service activation.

The Building Permit Application shares similarities with the Peco Service and Meter Application in that both are essential for construction or renovation projects. Each document requires specific details about the project, including timelines and service requirements. Additionally, both applications must be submitted to relevant authorities for approval before work can commence, ensuring compliance with local regulations and safety standards.

The Commercial Service Application is another document that mirrors the Peco application. This form is utilized by businesses seeking utility services and, like the Peco application, it requires comprehensive information about the business, including tax identification numbers and service specifications. Both applications ensure that the utility provider has the necessary information to deliver services effectively and efficiently.

Similarly, the Electrical Inspection Application is akin to the Peco Service and Meter Application. Both documents are essential for ensuring that electrical work complies with safety standards. The Electrical Inspection Application requires details about the electrical work being performed, while the Peco application specifies the type of service requested. Each application plays a critical role in safeguarding public safety and ensuring that electrical systems are installed correctly.

The New Construction Service Application also parallels the Peco application. This form is specifically designed for new construction projects and requires information about the building, including size and service needs. Both applications emphasize the importance of providing accurate load information and service characteristics to facilitate proper service installation and compliance with utility requirements.

Lastly, the Demolition Permit Application is similar in that it addresses the need for utility service adjustments during the demolition process. Just as the Peco application outlines the steps for service initiation or modification, the Demolition Permit Application details the requirements for safely disconnecting utilities before demolition begins. Both documents ensure that the utility provider and the customer coordinate effectively to avoid service interruptions and safety hazards.

Dos and Don'ts

When filling out the PECO Service and Meter Application form, consider the following do's and don'ts:

  • Do read the instructions carefully before starting the application.
  • Do provide accurate information, including your driver's license number or social security number.
  • Do specify the type of service and construction status clearly.
  • Do include any additional comments that may assist in processing your application.
  • Don't leave any required fields blank; incomplete applications may cause delays.
  • Don't forget to sign and date the application before submission.

Misconceptions

Misconceptions about the PECO Service and Meter Application form can lead to confusion and delays. Here are seven common misunderstandings:

  • Only homeowners need to fill out the application. Many people believe that only homeowners require this application. In reality, electricians, contractors, and businesses also need to complete it for various types of service requests.
  • A driver's license number is optional. Some applicants think providing a driver's license number is not necessary. However, it is now a required field for all customers applying for service.
  • Incomplete applications will still be processed. Many assume that minor omissions won't affect their application. Incomplete information can lead to significant delays, as PECO requires all fields to be filled out accurately.
  • PECO will automatically determine the service type. Some individuals think that PECO will figure out what type of service they need without input. Applicants must specify the type of request and service characteristics in the application.
  • There is no need to indicate construction status. Some applicants believe that their current construction status is irrelevant. However, PECO requests this information to understand the timeline and urgency of service needs.
  • The application can be submitted anytime. Many think they can submit the application whenever they want. In fact, if PECO does not hear from the customer within 90 days of their response, the request may be canceled.
  • Comments section is optional. Some applicants overlook the comments section, thinking it is not important. Including additional comments can provide PECO with necessary context and help ensure a smoother process.

Key takeaways

When filling out the PECO Service and Meter Application form, it’s essential to follow the instructions carefully to ensure a smooth process. Here are some key takeaways:

  • Choose the correct regional office: Identify the PECO regional office based on your service location and send your completed application there.
  • Provide accurate identification: Include the customer’s name, service location, and either a Driver's License Number or Social Security Number.
  • Billing address: Fill in the customer’s PECO billing address or account number from the last 60 days.
  • Electrician or contractor details: Include your information as the electrician or contractor, along with a Tax Identification number and the desired reply date.
  • Specify construction status: Clearly indicate the current status of construction and the date when PECO service is requested.
  • Complete service details: Provide information about the type of request, type of service, service characteristics, and meter information.
  • Load characteristics: Accurately complete the load characteristics table, detailing connected KW and maximum demands for summer and winter.
  • Motor information: Include any relevant motor specifications if applicable.
  • Signature required: Ensure the application is signed and dated to avoid processing delays.

Following these guidelines will help facilitate the application process and ensure that all necessary information is provided for PECO's review.